|
An elevated view
from the S shows the Sifter Station at the NE corner of the site
model. We used rocker sifters (on flexible stands of rebar) along
with water from a hose to which we fortunately had access.. The dark
washed “fines” beneath the sifter are clearly visible. Other details
include a Unit under excavation with level lines still up; the
footing wall from a former building intrusive over the site, with
scale board on top (large rectangles are 1 ft. long), and shovel,
buckets, etc. |